Mainpower Stadium - Rangiora

Mainpower Stadium - Rangiora

Project Type
Commercial

Location
Rangiora

Completion Date
2021

Waimakariri Sports Hub – MainPower Stadium

Beattie Air is proud to have been part of the Waimakariri Sports Hub, an impressive 6,468m² multi-use sports and fitness facility in Rangiora, delivered in collaboration with Leighs Construction.

This $28M development, built by the Waimakariri District Council, is a key addition to the region’s sporting infrastructure, catering to both local athletes and major sporting events.

Project Overview

  • Client: Leighs Construction
  • Location: Rangiora
  • Project Size: 6,468m²
  • Duration: 2020 – 2021
  • Technology Used:
    • Temperzone Air Handling Units (AHUs)
    • Daikin Rooftop Packaged Units (RPUs) and VRF Systems
    • Building Management System (BMS) for advanced climate control

A State-of-the-Art Sports Facility

MainPower Stadium is a world-class multi-use sports and fitness hub, incorporating:

  • Four full-sized sports courts designed for multiple sporting codes
  • Seating for up to 700 spectators, allowing for major sporting events
  • Community fitness centre and group fitness studios
  • Juice/coffee hub for visitors and athletes
  • Sports health provider treatment rooms
  • Dedicated sports administration offices and multi-function meeting rooms

Beattie Air’s Contribution

Our team successfully delivered a comprehensive climate control solution, ensuring optimal temperature and air quality for athletes, spectators, and staff. Key challenges included:

  • Balancing efficiency with performance, designing an HVAC system that could adapt to varying occupancy levels across different spaces
  • Integrating advanced BMS controls to provide intelligent climate management throughout the facility
  • Coordinating with multiple stakeholders, ensuring all HVAC installations aligned with the fast-paced construction schedule

By incorporating Temperzone AHUs for ventilation and Daikin systems for heating and cooling, we ensured an energy-efficient and high-performing environment suitable for a premier sports facility.

The result is a state-of-the-art complex that provides athletes and the wider community with a comfortable, well-ventilated space to train, compete, and gather.

Another landmark project delivered.

Project Partners